The
work begins. Heavy machinery
is brought in to clear the land and prepare the foundation
for the new extension.
|
|

The digger
claws into the sloping land beside the school building.
|

Our site
manager and technician. |
|

The first
lorry-load of soil to be cleared from the site.
|
|
 |
The
digger works away. In the foreground are some of the
materials that will be used during the construction project.
Those rough looking logs are probably lined up for
use as props and scaffolding - common materials and techniques
we saw used on construction sites whilst travelling around
Bulgaria. Not like the metal poles and jacks we use
here, but the end result is a good sturdy building just
the same.
To meet building regulations all new constructions are made
of reinforced concrete. |